With Drupa nearing almost on our calendars, we are all geared up for with the updates. Post receiving design approvals from Uflex; BoothConstructions.com has now been accelerating on the production process for them. As we already updated you last week with our design proposals for Drupa in our blog post Growing with our clients, we are now bringing you updates straight from the exhibition hall where our team is constructing their exhibit with full stride and power.
In this post, you will see how much efforts and creativity goes into the trade show booth building process and how our operations team has to struggle to achieve the designs promised to the clients. One of the major thing that you need to see is that it takes a lot intricate efforts to get the designing right, and it is all about managing the team. This task for BoothConstructions.com is personally taken up by Anurag, who is currently in Dusseldorf and working to ensure that we deliver the perfect results to our clients.
As Drupa is taking place after four years, it is considered as one of the biggest exhibitions in the print and packaging industry which also happens to be our forte. So these pictures straight from the site for Uflex bespoke the USP of BoothConstructions well and will take you through our construction process.
Summary:
Exhibition Name: Drupa 2016
Venue: Dusseldorf Germany
Dates: 31st May-10th June
Company: Uflex Ltd
Stand and Hall No.: C51 & 15 respectively
Area: 364.5 sqm
1. Stepping in the exhibition venue, Messe Dusseldorf with Drupa flags furling all over!
2. Our team working on the graphics for Uflex exhibit.
3. Paint the town with the colors of Uflex Ltd.
4. Shipping and placement of the products in the exhibit.
5. The raw look of the Uflex exhibit stand at Drupa 2016.
We will soon come back to you with the final output images and updates from our other 2 client exhibits. Till then adios!